BAOTAO, CHINA – DECEMBER 17, 2010
Workers monitor the volatile mixture of lime with molten iron at one of the blast furnaces within the Baogang Steel Company....
Workers monitor the volatile mixture of lime with molten iron at one of the blast furnaces within the Baogang Steel Company....
A Chinese worker looks out of a ventilation tunnel across the Jalong river. This small vent is over 800m above the river's surface and is the start of over 32 km of tunnels....
A jack-pump extracts a water and oil mixture from the Inner Mongolian Oil Field....
ORBITAL FACILITY, VIRGINIA, – 27 APRIL, 2013: Portait of Mr. June Moon who is a Senior Antenna Engineer that worked on the design and test of the SES-8 deployable reflectors. SES-8 is built by Orbital Sciences Corporation and will be the first geostationary satellite...
The Satellite SES-6, commissioned by SES and constructed by Astrium, is mounted in the Near Field Range of Astrium’s test facility in Toulouse. The satellite is seen with all of its reflectors deployed. The SES-6 satellite is scheduled to provide significant capacity expansion to provide...